Renovation Guide: Four Things Should Be Noted During Summer Decoration

Gradually after 80, has or will enter the marriage, many young people after 80 have bought a house, you can see the decoration, but many people will worry about: summer decoration will not be good? If the decoration needs to pay attention to what aspects? Xiao Bian gave you today some knowledge you should pay attention to in summer decoration.


Casa Ruidu sofa


First, avoid moisture in the material

In summer, the air humidity is high, and some materials that easily absorb moisture, such as wood boards and gypsum boards, are handled improperly during transportation or storage, and are prone to dampness. The wetted boards will have moldy spots. If wood keels and wooden devices made of sheet material are gradually dried in the air, the moisture in the materials will be easily deformed after cracking, which will also affect other materials. Such as the use of sheet metal gypsum ceiling, because the shrinkage factor of the plate is larger than the gypsum, wooden keel setting will directly lead to the cracking of the gypsum ceiling, which can easily affect the quality of the decoration. To avoid moisture in the material, place the material in a ventilated, dry place away from windows and water. If there is good ventilation in the home and there is a place where materials are placed, you can buy the wet materials that will be used sooner. Pay attention to the stacking and storage of the materials: semi-finished wood, wooden floors or freshly painted furniture, do not rush to put them into place. In the sun exposure, it should be noted that in a dry and ventilated place to dry naturally, otherwise the material is not only easy to deformation and cracking, but also affect the quality of construction. The materials accumulated in the warehouse are generally damp, and they can be stored and stored at home for ventilation and drying to ensure maximum material quality.

1, tiling

Before paving the floor tiles and wall tiles, the bottom layer of the veneer must not be too dry. Generally, the water should be poured before the treatment, allowing it to absorb about half an hour, and then use the cement mortar to ensure a firm adhesion. Since the material is drier than normal, the time required for the treatment of the swelled water should be extended for the tiles, tiles and other materials that need to be treated with swelled water, so that they are sufficiently close to saturation.

In this way, there will be no emptying or detachment of the tiles when they are cemented together due to lack of water absorption.

2, paint

Difficulties with oil workers: hot flashes in the rain, dry after brushing paint, and the paint absorbs moisture in the air, it will produce a layer of matte. Therefore, it is required that rain and sky construction cannot open doors and windows, and an electric heater is added to improve indoor dryness. In addition, fog can not be constructed. In summer construction, it is necessary to brush the interface agent before scraping the putty to prevent the alkaline substance of the wall from seeping onto the latex paint.

It is humid in the summer, and the interior decoration will run into latex paint because of slow drying and moldy smell in hot weather. In the project, we must do a good job of drying the primary putty. The wall must be painted three to four times before putting paint on it. After each putty, the drying time should be as long as possible, be well ventilated, and minimize indoor moisture. If the putty does not dry out, put on putty or brush paint repeatedly, lock in too much water, the wall will appear "sweat", or even a large area of ​​cracking.

Second, pay attention to aftercare

Well cement, put in some water maintenance every three or five days to prevent cracking. If the cement has just wet the floor, be sure to dry it before laying the floor. If it is on the first floor, it is best to use a waterproof paint brush once before laying the floor. Before construction, all products should be read in detail, such as instructions for chemical products such as glue, adhesives, paints, etc., must be constructed according to the temperature and environment stated in the manual to ensure the stability of chemical product quality. After the renovation, you will encounter a variety of flavors that will not affect people's health. It is recommended to put a few pots of green plants or put a few lemons and pineapples inside the house to quickly remove odors. Some black walls are mainly due to the dampness of the outer walls of the rainy days. The moisture slowly penetrates through the walls, and the moisture can't be emitted after the wooden wall paint is sealed. This can lead to blackening and warping of the paint film. Therefore, it is necessary to do anti-seepage treatment on the balcony as a protective wall. Before scraping the putty, wipe it off with a dry cloth and wipe it. Open all doors and windows to ensure proper ventilation.

Third, the wood floor leaves room for expansion appropriate

When laying floorings, make sure that you have a good understanding of the dimensions. When laying floors, the gaps should be arranged more closely than before to avoid gaps when the temperature decreases and affect the appearance.

The floor and wall joints can be used to form a transition between the floor layering. This not only handles the disadvantages of the wall and the floor is too large gap also played an aesthetic role. Floor gaps that are too large or too small can affect the pavement effect. The gap in the floor is too small. After the wood floor is inflated, it will deform.

Fourth, make a seasonal warranty

After the home improvement project is completed, there will be a two-year warranty period to repair the seasonal cracks in the project. For example, the expansion coefficient of the two different materials is not the same as the connection between the door cover and the wall and the plaster line and the wall. It is prone to cracking when the season changes and the air humidity changes. This cracking is a normal cracking, and it transitions from the damp summer to the In dry winter, this phenomenon is more common and belongs to the repair company's warranty. Do not rush to repair seasonal quality problems in your home. Into the autumn, the air gradually becomes dry. At this time, problems may occur due to seasonal changes, such as the change of temperature and humidity, such as the shrinkage of the wooden floor and the increase in the gap between the board and the board; the wall and the door frame are of different materials. The shrinkage rate is different and there are gaps; the cracking of the wall surface... These are all normal phenomena that occur during seasonal conversion. Do not rush to repair these maintenance items. The cracking of the wall shows that the moisture in the wall is gradually evaporating. If the water is repaired at this time, the wall may continue to crack if the water continues to evaporate. It is better to wait until the water in the wall is suitable for the external climate and then perform another repair.


Summer decoration knowledge del floor nature floor paint cement window paint latex paint decoration look decoration company okay floor tile cloth sofa outer wall tile tile adhesive floor tile balcony tile ld tile

Color Coated Aluminium Coils

Jinfa Copper And Aluminum Company Limited , http://www.gdaluminumcoil.com