Waterproof material purchase instructions: must know six tips and nine details

Decoration waterproof material purchase, waterproof materials on the market more and more, all kinds of different, if the selection of waterproof material is not qualified or construction is not standardized, there will be leakage in two or three years, consumers should deal with the key aspects of waterproof construction Necessary supervision.

Decoration waterproof materials to buy six skills First, when buying must recognize the brand name: At present, the proliferation of goods in the market, the state has ordered the elimination of toxic materials, a large number of banned into the people's home. Ordinary consumers should choose brand products with high reputation, good reputation, high security, and international quality system certification.

Second, waterproof parts to be comprehensive: bathroom floor and wall (back to high not less than 1.8 meters or full), kitchen, balcony floor and wall (return no less than 0.3 meters high), first floor residential all The ground and walls (0.3 meters back), the basement and all walls of the basement should be treated with water and moisture.

Third, the thickness of the waterproof layer should be enough: the thickness of the waterproof layer will directly affect the waterproof life, if you reduce the thickness of the waterproof layer is equivalent to reducing its waterproof life.

Fourth, the construction process should be meticulous: wall surface and ground joints, yin and yang angle, water pipes, floor drains and sanitary ware around and lay cold and heat pipes within the gutter is the focus of the waterproof parts, the construction must be careful.

5. Closed water test after completion: After the waterproof construction is completed, close the door and the water outlet, and store water in the room for 24 hours to check for leaks.

6. If leakage is found, remedial measures should be implemented.

Decoration waterproof material to buy nine details 1 ceiling: Because the bathroom water heavy, so we must choose those with waterproof, anti-corrosion, anti-rust characteristics of the material.

2 Ground: Be sure to waterproof before paving tiles; after laying tiles, make sure that the brick surface has a slope of drainage (usually about 1% is appropriate), the slope is facing the floor drain; the ground must be done after laying tiles Closed water experiment, the time must be guaranteed at least 24 hours; laying tiles should pay attention to the seams and alignment of the wall tiles, to ensure the overall sense of the entire bathroom, so as not to produce a visually cluttered impression.

3 Wall: The tiles on the wall should also be waterproof and moisture-proof, and the tiles should be flat and must be aligned with the floor tiles to ensure the overall sense of the wall and the ground; if the water supply pipeline is encountered, The cut of the tile should be small and appropriate, and the flange cover on the water feeder should be convenient to cover the cut, making the appearance perfect.

4 Doors and Windows: It is best to have windows in the bathroom for ventilation; if there are no windows, pay special attention to the details of the doors. In order to prevent the water in the bathroom from overflowing, the door should be slightly higher than the inner side of the bathroom; the gap between the door and the floor of the bathroom should be kept a little larger to facilitate the return; if it is a sliding door, but also in the sliding door and bathroom Make a waterproof layer between the tiles.

5 Circuit laying: The wire joints of the bathroom must be tin-plated, and waterproof tapes and insulating tapes must be wrapped in order to ensure safety; the wire body must be covered with flame-retardant tubes; all switches and sockets must have moisture-proof boxes, and the position is also According to the size and location of the appliance, to ensure the use of convenient and reasonable.

6 waterway transformation: Bathroom water supply and drainage line is best not to make too much changes, if you want to change, depending on the specific circumstances, such as the washing machine model, the location of the water will be different.

7 Sanitary ware installation: It is better to record the water hole distance before the decoration, according to the size of the bath, bath room, toilet, wash basin and other sanitary ware, so as not to fit in the size of the decoration is inappropriate; toilet installation should be used to sit first The mud is sealed and then fixed with expansion screws or glass glue so that it can be easily repaired when the toilet is clogged.

8 Ventilation: The bathroom must have an exhaust fan, and the exhaust fan must have a retrograde gate to prevent backflow of dirty air.

9 Greening: Adding anger. The bathroom should not be a corner forgotten by the green. When decorating, you can choose some shade-tolerant, hi-potted pots to be placed in the bathroom, making it a bit more angry and lively.