3 tips to teach you how to control hydropower reform costs

When we are decorating our home, we must not be able to save the province where it is not. However, the province’s place must be saved. If you don’t plan and control it well, you will lose it. Most of the unnecessary funds are completely unnecessary. The following Xiaobian has summarized the tips for how to control the cost of hydropower reform.

First, strict budget for control drawings

Before the signing of the renovation contract, the designer is required to show the water circuit transformation drawings and calculate the number of possible transformations of telephone lines, power outlets, switch panels, waterway reconstructions, cable television lines, and network cable transformations. Reasonable expenses to avoid excessive increase in costs. When the bottom is reached, the location of the hydropower needs to be determined one by one to the site. It is best to record the direction of the lines and the water pipes by photos or videos. The original developer will have some outlets and decide in advance whether to change it. If it is not replaced, the workers must be taken care of by themselves. Otherwise, they are often unaware of who is damaged and need to buy it again. In each room where to place the light must first be determined; the kitchen should have more power outlets; pre-installed several air-conditioning to install, is the cabinet machine or hang up, in order to determine the location of the socket; to make a good reservation lamp, bath place, kitchen Flue position and future checkpoints; if surround speakers, set aside an audio cable exit opposite the living room TV wall for the final placement of the surround speakers; toilets should be equipped with washout mop outlets, if you wish, you can buy a mop pool The overall cabinet is best determined before the start of work, to facilitate the determination of the future transformation of water pipes and gas pipelines. Before starting work, workers should be allowed to determine the wall distance between the toilet and the wash basin so that there is sufficient time to choose the right bathroom facilities.

Second, mid-term acceptance to avoid rework

Such as kitchen and bathroom waterproof, buried underground water and electricity pipelines, after the construction of the floor tiles found that water is not qualified, the wiring pipeline is not connected, plumbing pipeline is not connected or water leakage, it can only be reworked. The floor drain of the washing machine is best not to use the deep water seal floor drain, because the water is too slow to meet the needs of the washing machine. Strong and weak wires cannot be in the same pipe and there will be interference. The concealed line pipe must be firmly fixed, otherwise the wall is easy to crack. The cost of hydropower reform is higher than that of the decoration company, mostly because at the beginning of the quotation, the decoration company will say that the actual cost of hydropower reform is based on the actual amount. The quotation is only a rough estimate. It is for the decoration company to let the decoration owner choose them. Most of the pressure will be very low.

Third: preparation before construction

Before the construction of new houses and hydropower, consumers can do the insulation test on the original wires first. If there is no problem with the test, and the wire diameter meets the requirements, they can be replaced without replacement. Consumers should not rely on the words of some decoration company constructors that “all developers use poor quality electric wires and are prone to electric leakage” and still have to make their own judgments.

Summary: The control of hydropower reform costs, in fact, only with a little care, the various aspects of the decoration can be saved, before signing a contract with the decoration company, the designer must calculate the cost to install the water and electricity needed for each link, there is a heart The bottom is always better, and then analyze the specific situation.

Hydropower renovation construction acceptance entrance decoration socket TV decoration decoration design TV wall room living room TV wall decoration find decoration company okay decoration living room cabinet door kitchen cabinet door bathroom door bathroom wash basin overall bathroom toilet design bathroom waterproof bathroom floor tile bathroom leak

Power Adapter

Extension Socket,Switch Socket,Power Supply

Solar Cells & Panels Co., Ltd. , http://www.chadapter.com