Integrated ceiling Yuba installation method Yuba installation precautions

The bathroom is very important to every family. Because we know the importance of it, everyone cares about the decoration effect. We don't know how to do it for those who don't understand the decoration. So everyone knows what needs to be paid attention to when installing the integrated ceiling Yuba? Today, Xiaobian will take a look at the integrated ceiling bathroom installation method and installation precautions!


集成吊顶浴霸安装


Integrated ceiling bath installation method


1, the installation of the corner line


The installation strip should be installed flat and firm, determine the installation height, and draw a horizontal line. After the tiles are properly placed, in the horizontal situation, the matching corner lines of the ceiling are integrated and tightly fixed on the tiles, so that there is no obvious gap.


2, the installation of the keel


The lower boom and the light steel keel are placed, and the distance between the boom and the keel is the same as the panel size. Inflate the eye at the top and fix all the booms. Connect the lower bottom of the boom to the hook, and then fix the main dragon skeleton in the middle of the hook and fix it.

The height of the nut is adjusted so that the bottom plane of the main keel is 3 cm from the plane line on the edge strip and fastened.


3, the installation of the keel


According to the actual installation length minus 5mm, take the required keel, put on the triangular hanging piece, and temporarily suspend all the keel with the triangular hanging piece on the main keel according to the drawings.


4, the installation of the gusset


Wear clean gloves and install the gussets to take into account the overall aesthetics and bilateral symmetry. Cutting method: Fix the template, use the utility knife and ruler to describe it more than three times, cut the edge into a 90 degree angle with scissors, and fold it 2-3 times by hand.

can. The corresponding surface of the template cutting opening is stuck in the keel, the cutting surface is placed on the edge strip, and the edge strip is pulled out to clamp the template. At this time, the triangular lifting piece can be clamped with the steel tongs and the main keel. .


5, the installation of the host


When designing the installation position of the heating type host according to the drawing, replace the template with the main panel to confirm the accurate installation position of the main unit; then place the main unit on the top of the keel. Install (embed) the electrical appliance, and make the panel and electrical interface flat and seamless.


6, the top line and mouth panel


At the top of the line, determine where to install the luminaire, where to install the kitchen and bathroom appliances, and arrange the line in advance. Buckle panel, this link is directly related to the overall effect of the ceiling. Not only should it be leveled, but it should be straight.


集成吊顶浴霸安装


Integrated ceiling Yuba installation precautions


1. Power wiring should be standardized:


Yuba's POWER CAN be up to 1100W or above. Therefore, the power supply wiring of the Yuba must be waterproof. It is best to use multi-wire copper core wire of not less than 1mm. All power wiring must be placed in the wall with plastic concealed pipe. Never allow for a clear line setting. The Yuba power switch must be a qualified product with a waterproof capacity of 10A or more, especially for an old house.


2, the thickness should not be too large:


In the installation problem, we must pay attention to the thickness of the Yuba when buying, generally about 20 cm, because the Yuba is installed on the roof, if you want to install the Yuba, you must add a layer to the roof. Top, which is the PVC ceiling we often say, so that the latter part of the Yuba can be sandwiched between the two tops. If the Yuba is too thick, then the decoration can be troublesome.


3, should be installed in the center of the bathroom:


Many families choose to be in the shower or bath position, so the surface looks convenient. In fact, there are many safety hazards, because the infrared radiation lamp heats up quickly, and if it is too close, it will burn the human body. The correct installation method should be installed on the top of the bathroom. The center position or slightly closer to the bathtub makes it safe and functional.


4. Do not spray with water:


Pay special attention when using it. Although the current Yuba is waterproof, it must not be used for water when it is actually used. Although Yuba's waterproof bulb has waterproof performance, the metal parts of the body cannot do this. If it is splashed with water, it will cause a short circuit in the power supply.


When installing Yuba, the first thing we need to consider is safety. It is very important to learn how to install it. The above is the introduction of the integrated ceiling Yuba installation method and installation precautions introduced by Xiaobian today. To finish more information, please continue to pay attention to the decoration home.


More related wonderful reading:

Oupu integrated ceiling Yuba installation method, Yuba purchase common sense

Bathroom integrated ceiling Yuba installation steps Yuba installation precautions

What are the main points of Philips integrated ceiling Yuba installation?

Integrated ceiling Yuba installation method integrated ceiling Yuba size

Integrated ceiling Yuba installation and replacement steps ceiling Yuba purchase tips


SOLAR FLOOD LIGHT

Solar Security Light,Solar Powered Flood Lights,Solar Powered Security Lights,Solar Led Flood Lights

Wuxi Shengda Yukun Energy Development co.,Ltd , https://www.xlite-solarlight.com