Primary rookie advanced must-see renovation process detailed

For the renovation of rookie, the first step is to decorate the renovation process to understand, understand what they do from start to finish, have a whole understanding, before you can understand something deeper. This article on the first-class decoration rookie to understand the decoration process detailed.

A detailed explanation of the decoration process - approach

The entry is mainly about the communication between the owner, the construction unit and the property, the signing of the relevant contract, the clearing of the decoration period, and the handling of the arrival of the community pass. The construction personnel entered the accommodation and specified the design items such as switches, sockets, retained and dismantled walls, bathroom faucet drainage arrangements, special treatment locations, and inspection of the doors and windows and the wall surface for conformity.

Editors remind: Both parties should handle the transfer, acceptance of written detailed documents and signed by both parties.

B Detailed Renovation Process - Hydropower Project

The hydropower phase mainly includes knocking walls, walls, and holes in the walls according to the design, as well as concealing works such as wiring and drains. Working hours are usually around 1-2 weeks, depending on the size of the house and the difficulty of construction. The concealment project is a very important aspect of decoration. It is related to the convenience and safety after residing, and the acceptance should be more careful.

Editor reminds: bearing wall must be prohibited knock, safety is always the first one, the outdoor window is strictly prohibited modification, otherwise leaking on the regret.

C Detailed Renovation Process - Mud and Woodworking Stage

The work in the masonry phase includes the paving of bathroom wall tiles, balcony floor tiles, kitchen wall tiles, bathtub foundation masonry, toilets and kitchen floor waterproofing layers. Working hours are usually around 3-4 weeks, depending on the size of the house and the difficulty of construction.

Editor reminds: The selection of the brick meets the personal preference and style of decoration on the line, too fancy will cause visual fatigue.

The woodworking phase includes the production of ceiling bases, wood bases, door bases, wooden window bases, wooden cabinets and wood-covered surfaces, wood-based primers, covered gypsum board ceilings, door line posts, and installations. The door also has kitchen, bathroom ceilings and wood keels installed. Working hours are usually around 3-4 weeks, depending on the size of the house and the difficulty of construction. It can usually be done at the same time as the mason.

Editor's note: Due to the solid wood product itself, it is easily deformed after being exposed to moisture, so construction should take into account its moisture-proof treatment.

D Detailed Renovation Process - Paint Construction Stage

The paint stage work procedures include the completion of wood finish putty, back cover, finish paint, as well as room wall surface polishing, surface putty, brush primer, topcoat and wallpaper paste. Working hours are usually around 1-2 weeks, depending on the size of the house and the difficulty of construction.

Editor's note: The easiest way to check a painter's brush is to take a flashlight from the side. If there is a shadow on the wall, it proves that the brush is uneven and needs to be repaired in time. In addition, if you have children at home, it is best to use environmentally friendly wall paint that is easy to scrub.

E Detailed Renovation Process - Completion

The main work procedure for completion acceptance is to check whether all previous work is qualified and whether it passes. Including inspection of wire lines, inspection of water pipes, faucets and sanitary ware; inspection of floor tiles and wall tiles; inspection of ceiling gypsum boards and metal buckle boards; inspection of wood styling, doors and windows, cabinets, doors and other parts of paint, inspection of wall paints, wallpapers, etc. Working hours are usually about 1 day.

Editor's note: When accepting, all types of construction workers should be in place, all parts of the inventory, avoid general, it is best to find someone with experience to accompany to go, so as not to leave regret.

Decoration process own decoration house flow decoration process detailed

processing aids help the processing of PVC by promoting fusion, improving melt strength, eliminating surface defects and decreasing plate out. They also enhance formulation metal release properties in extrusion and calendering applications while offering improved cost performance versus traditional lubricant packages.

Acrylic Processing Aid

Acrylic Processing Aid, CPE Compound for Cable Jacket, Chemical Acrylic Processing Aid, PVC Acrylic Processing Aid

Shandong Novista Chemicals Co.,Ltd (Novista Group) , https://www.novistachem.com