Let you clearly understand how to install Yuba how to install Yuba

In the cold winter, Yuba gave us a very comfortable shower experience and no more cold. Yuba and integrated ceiling installation, the installation method of that bath is what? Many people can not help wondering, today we introduce the following content, take a look at the installation method of Yuba !

Yuba installation method

Step 1. Before the installation of Yuba, first of all to do a good job preparatory work, in addition to home bathroom space to prepare pvc ceiling, you need to open the ventilation hole and install the ventilation window, where the ventilation pipe hole spacing in the 1.5 meters up and down, in addition to installation It should also be noted that the center of Yuba's position should not be more than 1.3 meters away from the ventilation hole.

Step 2. After the preparation is completed, it is necessary to determine the installation position of the bathroom heater, which is generally installed directly above the shower area, such as a bathtub and a shower room. Therefore, the ceiling of the bathroom space should be made of materials with strong waterproof and moisture proof properties. After the Yuba is installed, the bulbs in the Yuba should be between 2.1 and 2.3 meters above the ground.

Step 3. Remove all bulbs from the Yuba, remove the spring from the Yuba mask ring, and remove the cap. If the connection of the end of the bathroom heater is connected to the switch circuit, you need to connect the other end of the bathroom heater to the ceiling outlet power cable. The Yuba junction box is opened, according to the product specification, to perform the appropriate wiring, and then the junction box is fixed and installed, pay attention to the need to insert extra wires into the ceiling, so that the Yuba smoothly installed into the hole. Then connect the ventilation pipe again, get the pipe to an arbitrary section of the room and then pull it out, install it on the tuyere of the centrifugal fan cover, and then put the bathroom box into the hole, and use the screw to fix the bathroom box on the ceiling. On the top, after confirming the firmness, you can install the Yuba mask.

Yuba installation precautions

1. If you are installing traditional Yuba products, when wiring, it should be noted that the power cord used must be a waterproof wire, and use Copper wires no less than 1 mm wide. In the process of wiring, the wires need to penetrate into the plastic pipe buried in the wall. Because the bathroom space has a large amount of water vapor, it is not advisable to go out of the pipe, especially in the decoration of old houses, and it needs to be more standardized.

2. If there is a shower room in the bathroom space, if you use an integrated ceiling, you don't need to install a bathroom heater. The shower room will usually have a matching shower. During the shower, the temperature will not be too low. Yuba's waterproofness is poor. If it is directly installed in the shower room, moisture vapor accumulation is prone to occur, making the product damp, which may cause safety hazards.

On the installation method of Yuba , Xiao Bian introduced it here for the time being. I hope I can help you. If you want to learn more about Yuba related knowledge, you can focus on this site information, more exciting content waiting for you.

Yuba installation bathroom heater installation method

Shower Faucets

JIANFA SANITARY WARE INDUSTRY CO., LTD , https://www.jfsanitary.com