Old house renovation and renovation steps old room renovation and renovation notes

With the improvement of people's quality of life, many users want to renovate their old house that has been living for many years, but they do not know how to start. Do not underestimate the transformation of the old house, compared to the new house, it should pay attention to the steps and details in the renovation more. Next, let's take a look at the renovation of the old house and the precautions in construction!

1, the old house renovation and transformation steps - design and planning

The decoration of the old house depends on the design of the overall material office. For example, what needs to be changed in the home and what needs to be renovated must be reflected in the design draft. It is also necessary to make a preliminary budget plan for the cost of the old house decoration.

2, old house renovation and transformation steps - demolition and transformation

After the overall design is carried out, the next step is to demolish the old and unsatisfactory structures.

3, the old house renovation and transformation steps - change the structure and change hydropower

Hydropower is a hidden project of home improvement, and rewiring is based on the function of space to normal life habits. Pay special attention during construction, otherwise there will be a lot of trouble in the later period.

4. Renovation steps of the old house - Renovation

After the hydropower is completed, the old houses after the demolition and renovation can be renovated according to the design drawings, such as the laying of the floor, painting of the wall surface, tiling, and ceiling ceilings. Then with the appropriate style of decoration.

5, the old house renovation and transformation steps - in addition to pollution,

After the renovation, there will be some residual pollution left by the interior of the house, which will seriously affect the health of the body. It is recommended that windows be ventilated after renovation and stay in the vicinity of 1-3 months.

6, old house renovation and transformation steps - moving house

After the release of harmful substances such as formaldehyde, it is possible to move home. It is advisable to select a sunny place to stay in. In accordance with the order in which the large items enter the house and the small items come in last.

Old house renovation and transformation notes :

1, structure

Before the transformation of the old house, it is necessary to make adjustments in the structure, through the demolition of part of the wall, top cabinets, cabinets, etc., will change the unreasonable place. Make the most of indoor space and lighting.

2, waterway

According to the restrooms, kitchens and other areas in the home, the positions of the washbasins, toilet bowls, washing machines, and sinks are determined, and the intake, outlet, and drain outlets are increased.

3, the circuit

The circuit reconstruction of the old house must be thorough. If the old house is of a long age, it is recommended that all the previous wires be replaced and planning be made again.

4, waterproof

The kitchen and bathroom of the old house lasted for a long time. Because some of them must be waterproof when laying, waterproof should be done evenly, and a 24-hour water-removal test should be conducted to ensure that there is no water leakage.

Conclusion: The above is to introduce the relevant content of the old house renovation and transformation steps , hoping to bring help for everyone, if you need to understand more relevant content later, welcome to pay attention to this site information.

1.Application : For optical and digital series
2.Dimension: Customized dimension, OEM & ODM
3.Material: A6063, A6061, A3003 and other series alu alloy        
4.Suface treatment: Anodizing, polishing, turning ,power coating, mill finish etc
5.Equipment: CNC ,extruding machine, cold drawn machine, heating oven, straightening machine, cutting machine  

OD

OD Tolerance

ID

Tolerance

Roundness

Straightness

Circular  

 run-out

φ16-20

±0.02

±0.02

0.01↓

0.015↓

0.05↓

φ20-30

±0.02

±0.02

0.01↓

0.015↓

0.05↓

φ30-50

±0.05

±0.05

0.02↓

0.020↓

0.08↓

φ50-80

±0.15

±0.10

0.05↓

0.025↓

0.10↓


6. STANDARD PACKING:Wooden case/carton

7. Trade Terms
1. Payment: 30% T/T in advance, 70% balance pay before delivery.  L/C at sight.
2. Delivery time: 20 days after deposit receiverd. If opening mould, plus 7-10 days.
3. Trade Term can be chosen depending on your requirements.
4. FOB Port: Shanghai

Drawn Tube For Optical And Digital Series

Drawn Tube For Optical And Digital Series,Aluminum Drawn Tube For Optical,Aluminum Drawn Tube For Digital,Optical And Digital Aluminum Tube

Changzhou YiFei Machinery Co., Ltd. , https://www.yifeialu.com